Innovative water solutions which save money and the environment

15+ years' industry knowledge

We’re experts in our field

Fast Delivery

Same day dispatch on many items

Helping the environment

With sustainable solutions

{"id":15869515760000,"title":"SuDS Construction Phase Plan","handle":"suds-construction-plan","description":"\u003cp\u003eA SuDS Construction Phase Plan provides the operational blueprint required by site managers, developers, and Local Authorities to manage surface water and pollution risks safely during construction. \u003c\/p\u003e\n\u003cp\u003eThe Construction Phase plan covers: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSilt \u0026amp; Runoff Mitigation: Prevents sediment-laden water from leaving the site, clogging public sewers, or polluting nearby rivers and streams.\u003c\/li\u003e\n\u003cli\u003eSatisfying Planning Conditions: Fulfills SuDS, Environment Agency (EA), and Local Lead Flood Authority (LLFA) pre-commencement drainage and environmental protection requirements.\u003c\/li\u003e\n\u003cli\u003eAsset Protection: Safeguards sensitive newly built SuDS features (such as rain gardens, bioretention basins, and permeable paving) from being blinded or damaged during active build phases.\u003c\/li\u003e\n\u003cli\u003eRisk Reduction: Reduces the risk of site flooding, environmental enforcement actions, expensive clean-ups, and project delays.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eRequired information: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFull site address including postcode, site boundary plans, and proximity to watercourses\/public sewers. \u003c\/li\u003e\n\u003cli\u003eProject Scope \u0026amp; Phasing Schedule: Brief outline of proposed groundworks (topsoil stripping, cut-and-fill volumes, deep drainage) and target construction dates.\u003c\/li\u003e\n\u003cli\u003eProposed Drainage \u0026amp; SuDS Layouts: Civil\/drainage drawings showing planned permanent drainage assets (e.g., ACO channels, gullies, permeable paving, rain gardens, attenuation tanks).\u003c\/li\u003e\n\u003cli style=\"color: rgb(5, 5, 5);\"\u003e\u003cspan style=\"color: rgb(5, 5, 5);\"\u003eSite Contacts names and contact details for the appointed Principal Contractor, Site Manager, and Safety\/Environmental Leads (if already appointed).\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cp\u003eIf SuDS design is required, please find our list of \u003ca href=\"https:\/\/loqs4yfye3tx1ji7-8294323.shopifypreview.com\/pages\/suds-calculation-service\"\u003eSuDS drainage design services\u003c\/a\u003e \u003ca href=\"https:\/\/www.freeflush.co.uk\/pages\/suds-calculation-service\"\u003ehere\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003ePlease note:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAllow 10 working days for the output to be delivered from supply of information requested above. \u003c\/li\u003e\n\u003c\/ul\u003e","published_at":"2026-08-05T14:48:40+01:00","created_at":"2026-07-31T14:09:03+01:00","vendor":"Freeflush","type":"calculation","tags":[],"price":18000,"price_min":18000,"price_max":18000,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":58601759605120,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"ComparativeSudscalc","requires_shipping":false,"taxable":true,"featured_image":null,"available":true,"name":"SuDS Construction Phase Plan","public_title":null,"options":["Default Title"],"price":18000,"weight":0,"compare_at_price":null,"inventory_quantity":0,"inventory_management":null,"inventory_policy":"deny","barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[],"quantity_rule":{"min":1,"max":null,"increment":1}}],"images":["\/\/www.freeflush.co.uk\/cdn\/shop\/files\/SuDSConstructionPhase_1550e6ea-ba77-4cc2-afca-b0c3598b3d8f.jpg?v=1785504050"],"featured_image":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/SuDSConstructionPhase_1550e6ea-ba77-4cc2-afca-b0c3598b3d8f.jpg?v=1785504050","options":["Title"],"media":[{"alt":"SuDS Construction Phase Plan - Freeflush Water Management Ltd. ","id":69928245821824,"position":1,"preview_image":{"aspect_ratio":0.788,"height":826,"width":651,"src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/SuDSConstructionPhase_1550e6ea-ba77-4cc2-afca-b0c3598b3d8f.jpg?v=1785504050"},"aspect_ratio":0.788,"height":826,"media_type":"image","src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/SuDSConstructionPhase_1550e6ea-ba77-4cc2-afca-b0c3598b3d8f.jpg?v=1785504050","width":651}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003cp\u003eA SuDS Construction Phase Plan provides the operational blueprint required by site managers, developers, and Local Authorities to manage surface water and pollution risks safely during construction. \u003c\/p\u003e\n\u003cp\u003eThe Construction Phase plan covers: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSilt \u0026amp; Runoff Mitigation: Prevents sediment-laden water from leaving the site, clogging public sewers, or polluting nearby rivers and streams.\u003c\/li\u003e\n\u003cli\u003eSatisfying Planning Conditions: Fulfills SuDS, Environment Agency (EA), and Local Lead Flood Authority (LLFA) pre-commencement drainage and environmental protection requirements.\u003c\/li\u003e\n\u003cli\u003eAsset Protection: Safeguards sensitive newly built SuDS features (such as rain gardens, bioretention basins, and permeable paving) from being blinded or damaged during active build phases.\u003c\/li\u003e\n\u003cli\u003eRisk Reduction: Reduces the risk of site flooding, environmental enforcement actions, expensive clean-ups, and project delays.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eRequired information: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFull site address including postcode, site boundary plans, and proximity to watercourses\/public sewers. \u003c\/li\u003e\n\u003cli\u003eProject Scope \u0026amp; Phasing Schedule: Brief outline of proposed groundworks (topsoil stripping, cut-and-fill volumes, deep drainage) and target construction dates.\u003c\/li\u003e\n\u003cli\u003eProposed Drainage \u0026amp; SuDS Layouts: Civil\/drainage drawings showing planned permanent drainage assets (e.g., ACO channels, gullies, permeable paving, rain gardens, attenuation tanks).\u003c\/li\u003e\n\u003cli style=\"color: rgb(5, 5, 5);\"\u003e\u003cspan style=\"color: rgb(5, 5, 5);\"\u003eSite Contacts names and contact details for the appointed Principal Contractor, Site Manager, and Safety\/Environmental Leads (if already appointed).\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cp\u003eIf SuDS design is required, please find our list of \u003ca href=\"https:\/\/loqs4yfye3tx1ji7-8294323.shopifypreview.com\/pages\/suds-calculation-service\"\u003eSuDS drainage design services\u003c\/a\u003e \u003ca href=\"https:\/\/www.freeflush.co.uk\/pages\/suds-calculation-service\"\u003ehere\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003ePlease note:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAllow 10 working days for the output to be delivered from supply of information requested above. \u003c\/li\u003e\n\u003c\/ul\u003e"}

SuDS Construction Phase Plan

£180.00
Maximum quantity available reached.

A SuDS Construction Phase Plan provides the operational blueprint required by site managers, developers, and Local Authorities to manage surface water and pollution risks safely during construction. 

The Construction Phase plan covers: 

  • Silt & Runoff Mitigation: Prevents sediment-laden water from leaving the site, clogging public sewers, or polluting nearby rivers and streams.
  • Satisfying Planning Conditions: Fulfills SuDS, Environment Agency (EA), and Local Lead Flood Authority (LLFA) pre-commencement drainage and environmental protection requirements.
  • Asset Protection: Safeguards sensitive newly built SuDS features (such as rain gardens, bioretention basins, and permeable paving) from being blinded or damaged during active build phases.
  • Risk Reduction: Reduces the risk of site flooding, environmental enforcement actions, expensive clean-ups, and project delays.

Required information: 

  • Full site address including postcode, site boundary plans, and proximity to watercourses/public sewers. 
  • Project Scope & Phasing Schedule: Brief outline of proposed groundworks (topsoil stripping, cut-and-fill volumes, deep drainage) and target construction dates.
  • Proposed Drainage & SuDS Layouts: Civil/drainage drawings showing planned permanent drainage assets (e.g., ACO channels, gullies, permeable paving, rain gardens, attenuation tanks).
  • Site Contacts names and contact details for the appointed Principal Contractor, Site Manager, and Safety/Environmental Leads (if already appointed).

    If SuDS design is required, please find our list of SuDS drainage design services here.

    Please note:

    • Allow 10 working days for the output to be delivered from supply of information requested above. 
    There is no additional documentation for this product

    If your query is related to an existing order please email in with your order number in the subject line. If you have a new residential enquiry please consult the online guides before calling as they may answer your question.

    The delivery information page is divided into 1. Specific and 2. General delivery information below. 

    1. Specific Delivery Information relating to product lines
    • Small items dispatched daily with RM24 ~85% arriving next day
    • Large items (UK made) typically 5 - 15 working days (Parcelforce/APC etc) 
    The following items have a 2-4 week lead time:
      • 1,000 litre compact underground rainwater tank
      • SAR40-TOP2 Wastewater Lifting station
      • Tubo Water Butt - 210 Litres

       The following items are purchased on a pre order basis with a potential 4-6 weeks lead time:

      • 2000 Litre Stone Effect Column Water Butt - Sand beige
      • 375 Litre Oasis Water Butt Planter
      • 280 Litre Slim Water Butt Rain Harvesting Tank
      • 380 Litre Tall City Water Butt Planter
      • Cosmo 150 Litre Mini Water Butt Planter
      • 255 Litre Metropolitan Water Butt Planter
      • 420 Litre Just Water Tall City Water Butt
      • 290 Litre Just Water Metropolitan Water Butt
      • City Water Butt Planter 180 Litre
      • Cosmo 200 Litre Water Butt Planter
      • All sizes in the Slim Water Butt Rain Harvesting Tank
      • Just Water Midi Metropolitan Water Butt 185 Litre
      • Just Water City Water Butt 210 Litre
      • Midi Metropolitan Water Butt Planter 165 Litre
      • 825 Litre Water Pillar 
      • 525 Litre Water Pillar Rainwater Tank
      The following items are purchased on a pre order basis with a potential 4-8 weeks lead time:
      • Green Roof sedum tray - pre planted option
      The following items (EU) are purchased on a pre order basis with a potential 10-12 week lead time:
      • Hydraloop
        2. General Delivery information

         

        We're a Manchester based company and ship to the UK at our standard rates. Please get in touch requesting the delivery surcharge value  if you are based in the Highlands or a UK island

        We no longer support ordering from the EU and Northern Ireland through the website. We can support ad hoc orders with limited liability.

        Our design and Prestige range is available in the Netherlands, Ireland, Belgium, France, Germany, through our distributors.

        Stock items will be dispatched on the day of order, if ordered before 1pm.

        Letters are sent 1st class. 

        Parcels <2kg are shipped with Royal Mail 24 with the following target delivery times.

        Guaranteed delivery can be arranged by advance agreement. This agreement is back to back with the courier and we will not be liable for any delays as per our terms.

        A loss/replacement can only be pursued in line with the target delivery times of the courier or once the courier accept loss. 

        Bulky items (and pallet deliveries) are dispatched within 2-15 working days. We will request a contact number if this has not been provided at checkout. 

        Some items are made to order (bespoke) and details are given on the listing for dispatch times.  If for any reason we anticipate a delay on our normal dispatch time we will contact you to let you know.

        Occasionally there are delays. We shall not be liable for any direct or indirect losses, costs, damages or expenses incurred by you or any other person for any delays in delivery.

        Missed deliveries where attempted delivery has been made usually result in re-deliveries the following day. The customer is responsible for organising re deliveries by contacting the courier direct

        Parcels/deliveries can only be "left out" if the delivering company allows that option. Parcelforce, for example, do not allow a parcel to be "left out". 

        We are an environment centric business and as such we try to minimise our waste. Our packaging is usually recycled and/or recyclable and we make efficient use of packaging to minimise wastage.

        Covid delivery updates between 12.3.20 and 11.1.21 21 have been archived here.

        Customer Reviews

        Be the first to write a review
        0%
        (0)
        0%
        (0)
        0%
        (0)
        0%
        (0)
        0%
        (0)