Innovative water solutions which save money and the environment

15+ years' industry knowledge

We’re experts in our field

Fast Delivery

Same day dispatch on many items

Helping the environment

With sustainable solutions

{"id":6999286972503,"title":"Drainage Design Drawing Pack - Residential","handle":"drainage-design-drawing-pack-residential","description":"\u003cp data-mce-fragment=\"1\"\u003eIf you or your client are at the pre planning stage, have a planning condition or need to satisfy building control you may require a Drainage Design to demonstrate how stormwater and foul water will be managed on site. \u003cbr\u003e\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong\u003eSUDS Design Package single dwelling\u003c\/strong\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSurface water and foul water drainage layout including manhole schedule.\u003c\/li\u003e\n\u003cli\u003eSurface water and foul water drainage construction details.\u003c\/li\u003e\n\u003cli\u003eSurface water hydraulic modelling including sizing of attenuation\/infiltration.\u003c\/li\u003e\n\u003cli\u003eFoul water calculations.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong\u003eRequirements\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\u003cspan\u003eTopographical survey of site (in CAD format - .dwg or .dxf). In the absence of topo a provisional design can be supplied. Images of the site will be required. If the topographical data subsequently becomes available the model can be revised (revision charges apply).\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eIf connecting to a downstream chamberor sewer the downstream invert level will be required. In the absence of this level a provisional design can be supplied.  If the downstream invert subsequently becomes available the model can be revised (revision charges apply). \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eProposed layout of development including locations of RWP's and SVP's, site boundary, number of bedrooms and finished floor level of development (in CAD format - .dwg or .dxf)\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eAny relevant planning conditions, allowable discharge rate etc., connection restrictions\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eInfiltration rates if there are any soakaway requirements for the proposed development.\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eOutputs\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eDrainage Design Plan, and manhole schedule (pdf) \u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eSupporting drainage calculations (pdf)\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eSupporting foul water calculations (pdf)\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eIf you require anything additonal to the scope of supply please get in touch\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eNotes\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eThis is a listing for a single dwelling drainage design. Quotes can be provided for:\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cblockquote\u003e\n\u003cul\u003e\n\u003cli\u003eLarger developments\u003c\/li\u003e\n\u003cli\u003eFlood risk assessments.\u003c\/li\u003e\n\u003cli\u003eSAB applications or LFA submission\/approval.\u003c\/li\u003e\n\u003cli\u003eSection 104, 105, 185 applications (Drawing package).\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/blockquote\u003e\n\u003cul\u003e\n\u003cli\u003ePlease get in touch to establish lead times. Typically 10-20 days from receipt of requested information. \u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eInformation requested is required to complete the calcs\/drawings. The calculations\/drawings cannot be commenced until the information requested is provided by the client in the format requested above. \u003c\/li\u003e\n\u003cli\u003eCalculation revisions are chargeable.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e","published_at":"2024-02-19T15:15:47+00:00","created_at":"2024-02-19T15:15:47+00:00","vendor":"Freeflush","type":"calculation","tags":[],"price":70000,"price_min":70000,"price_max":70000,"available":true,"price_varies":false,"compare_at_price":null,"compare_at_price_min":0,"compare_at_price_max":0,"compare_at_price_varies":false,"variants":[{"id":40518911393879,"title":"Default Title","option1":"Default Title","option2":null,"option3":null,"sku":"DrainDesPack","requires_shipping":false,"taxable":true,"featured_image":null,"available":true,"name":"Drainage Design Drawing Pack - Residential","public_title":null,"options":["Default Title"],"price":70000,"weight":0,"compare_at_price":null,"inventory_quantity":0,"inventory_management":null,"inventory_policy":"deny","barcode":null,"requires_selling_plan":false,"selling_plan_allocations":[]}],"images":["\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_19_7c565bbd-113b-458e-9a63-bb2ee5a27950.jpg?v=1708355756","\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_1_77b3bc3d-41b0-41ec-8e6a-09949c81bbd4.jpg?v=1708355756","\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_2_26477f00-5abf-41fc-8773-2af0c4130203.jpg?v=1708355756","\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_3_33bc4612-e6a9-4cb0-8499-6f9a6f526c9b.jpg?v=1708355756","\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_b0aca8a8-8e8d-474f-b842-eee2eed26a47.jpg?v=1708355757"],"featured_image":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_19_7c565bbd-113b-458e-9a63-bb2ee5a27950.jpg?v=1708355756","options":["Title"],"media":[{"alt":null,"id":23744445939799,"position":1,"preview_image":{"aspect_ratio":1.426,"height":856,"width":1221,"src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_19_7c565bbd-113b-458e-9a63-bb2ee5a27950.jpg?v=1708355756"},"aspect_ratio":1.426,"height":856,"media_type":"image","src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_19_7c565bbd-113b-458e-9a63-bb2ee5a27950.jpg?v=1708355756","width":1221},{"alt":null,"id":23744445972567,"position":2,"preview_image":{"aspect_ratio":1.317,"height":884,"width":1164,"src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_1_77b3bc3d-41b0-41ec-8e6a-09949c81bbd4.jpg?v=1708355756"},"aspect_ratio":1.317,"height":884,"media_type":"image","src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_1_77b3bc3d-41b0-41ec-8e6a-09949c81bbd4.jpg?v=1708355756","width":1164},{"alt":null,"id":23744446038103,"position":3,"preview_image":{"aspect_ratio":0.95,"height":606,"width":576,"src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_2_26477f00-5abf-41fc-8773-2af0c4130203.jpg?v=1708355756"},"aspect_ratio":0.95,"height":606,"media_type":"image","src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_2_26477f00-5abf-41fc-8773-2af0c4130203.jpg?v=1708355756","width":576},{"alt":null,"id":23744446070871,"position":4,"preview_image":{"aspect_ratio":0.738,"height":726,"width":536,"src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_3_33bc4612-e6a9-4cb0-8499-6f9a6f526c9b.jpg?v=1708355756"},"aspect_ratio":0.738,"height":726,"media_type":"image","src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_3_33bc4612-e6a9-4cb0-8499-6f9a6f526c9b.jpg?v=1708355756","width":536},{"alt":null,"id":23744446103639,"position":5,"preview_image":{"aspect_ratio":0.845,"height":653,"width":552,"src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_b0aca8a8-8e8d-474f-b842-eee2eed26a47.jpg?v=1708355757"},"aspect_ratio":0.845,"height":653,"media_type":"image","src":"\/\/www.freeflush.co.uk\/cdn\/shop\/files\/download_b0aca8a8-8e8d-474f-b842-eee2eed26a47.jpg?v=1708355757","width":552}],"requires_selling_plan":false,"selling_plan_groups":[],"content":"\u003cp data-mce-fragment=\"1\"\u003eIf you or your client are at the pre planning stage, have a planning condition or need to satisfy building control you may require a Drainage Design to demonstrate how stormwater and foul water will be managed on site. \u003cbr\u003e\u003c\/p\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong\u003eSUDS Design Package single dwelling\u003c\/strong\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSurface water and foul water drainage layout including manhole schedule.\u003c\/li\u003e\n\u003cli\u003eSurface water and foul water drainage construction details.\u003c\/li\u003e\n\u003cli\u003eSurface water hydraulic modelling including sizing of attenuation\/infiltration.\u003c\/li\u003e\n\u003cli\u003eFoul water calculations.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp data-mce-fragment=\"1\"\u003e\u003cstrong\u003eRequirements\u003c\/strong\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\u003cspan\u003eTopographical survey of site (in CAD format - .dwg or .dxf). In the absence of topo a provisional design can be supplied. Images of the site will be required. If the topographical data subsequently becomes available the model can be revised (revision charges apply).\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eIf connecting to a downstream chamberor sewer the downstream invert level will be required. In the absence of this level a provisional design can be supplied.  If the downstream invert subsequently becomes available the model can be revised (revision charges apply). \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eProposed layout of development including locations of RWP's and SVP's, site boundary, number of bedrooms and finished floor level of development (in CAD format - .dwg or .dxf)\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eAny relevant planning conditions, allowable discharge rate etc., connection restrictions\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eInfiltration rates if there are any soakaway requirements for the proposed development.\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ol\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eOutputs\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eDrainage Design Plan, and manhole schedule (pdf) \u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eSupporting drainage calculations (pdf)\u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eSupporting foul water calculations (pdf)\u003c\/li\u003e\n\u003cli\u003e\u003cstrong\u003eIf you require anything additonal to the scope of supply please get in touch\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eNotes\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eThis is a listing for a single dwelling drainage design. Quotes can be provided for:\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cblockquote\u003e\n\u003cul\u003e\n\u003cli\u003eLarger developments\u003c\/li\u003e\n\u003cli\u003eFlood risk assessments.\u003c\/li\u003e\n\u003cli\u003eSAB applications or LFA submission\/approval.\u003c\/li\u003e\n\u003cli\u003eSection 104, 105, 185 applications (Drawing package).\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/blockquote\u003e\n\u003cul\u003e\n\u003cli\u003ePlease get in touch to establish lead times. Typically 10-20 days from receipt of requested information. \u003cbr\u003e\n\u003c\/li\u003e\n\u003cli\u003eInformation requested is required to complete the calcs\/drawings. The calculations\/drawings cannot be commenced until the information requested is provided by the client in the format requested above. \u003c\/li\u003e\n\u003cli\u003eCalculation revisions are chargeable.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e"}

Drainage Design Drawing Pack - Residential

£700.00
Maximum quantity available reached.

If you or your client are at the pre planning stage, have a planning condition or need to satisfy building control you may require a Drainage Design to demonstrate how stormwater and foul water will be managed on site.

SUDS Design Package single dwelling

  • Surface water and foul water drainage layout including manhole schedule.
  • Surface water and foul water drainage construction details.
  • Surface water hydraulic modelling including sizing of attenuation/infiltration.
  • Foul water calculations.

Requirements

  1. Topographical survey of site (in CAD format - .dwg or .dxf). In the absence of topo a provisional design can be supplied. Images of the site will be required. If the topographical data subsequently becomes available the model can be revised (revision charges apply).
  2. If connecting to a downstream chamberor sewer the downstream invert level will be required. In the absence of this level a provisional design can be supplied.  If the downstream invert subsequently becomes available the model can be revised (revision charges apply). 
  3. Proposed layout of development including locations of RWP's and SVP's, site boundary, number of bedrooms and finished floor level of development (in CAD format - .dwg or .dxf)
  4. Any relevant planning conditions, allowable discharge rate etc., connection restrictions
  5. Infiltration rates if there are any soakaway requirements for the proposed development.

    Outputs

    • Drainage Design Plan, and manhole schedule (pdf)
    • Supporting drainage calculations (pdf)
    • Supporting foul water calculations (pdf)
    • If you require anything additonal to the scope of supply please get in touch

    Notes

    • This is a listing for a single dwelling drainage design. Quotes can be provided for:
    • Larger developments
    • Flood risk assessments.
    • SAB applications or LFA submission/approval.
    • Section 104, 105, 185 applications (Drawing package).
    • Please get in touch to establish lead times. Typically 10-20 days from receipt of requested information.
    • Information requested is required to complete the calcs/drawings. The calculations/drawings cannot be commenced until the information requested is provided by the client in the format requested above. 
    • Calculation revisions are chargeable.

     

    There is no additional documentation for this product

     

    If your query is related to an existing order please email in with your order number in the subject line. If you have a new residential enquiry please consult the online guides before calling as they may answer your question.

    The delivery information page is divided into 1. Specific and 2. General delivery information below. 

    1. Specific Delivery Information relating to product lines
    • Small items dispatched daily with RM24 ~85% arriving next day
    • Large items (UK made) typically 5 - 15 working days (Parcelforce/APC etc) 
    The following items have a 2-4 week lead time:
      • 1,000 litre compact underground rainwater tank
      • 250 litre Prestige large Plant Pot style planter Grey
      • SAR40-TOP2 Wastewater Lifting station
      The following items (EU) are purchased on a pre order basis with a potential 4-8 weeks lead time:
      • Hydraloop
      • Green Roof sedum tray - pre planted option
      • Madison 185 Litre rain barrel - Millstone
      The following items (EU) are purchased on a pre order basis with a potential 10-12 week lead time:
        2. General Delivery information

         

        We're a Manchester based company and ship to the UK at our standard rates. Please get in touch requesting the delivery surcharge value  if you are based in the Highlands or a UK island

        We no longer support ordering from the EU and Northern Ireland through the website. We can support ad hoc orders with limited liability.

        Our design and Prestige range is available in the Netherlands, Ireland, Belgium, France, Germany, through our distributors.

        Stock items will be dispatched on the day of order, if ordered before 1pm.

        Letters are sent 1st class. 

        Parcels <2kg are shipped with Royal Mail 24 Tracked with the following target delivery times.

        Guaranteed delivery can be arranged by advance agreement. This agreement is back to back with the courier and we will not be liable for any delays as per our terms.

        A loss/replacement can only be pursued in line with the target delivery times of the courier or once the courier accept loss. 

        Bulky items (and pallet deliveries) are dispatched within 2-15 working days. We will request a contact number if this has not been provided at checkout. 

        Some items are made to order (bespoke) and details are given on the listing for dispatch times.  If for any reason we anticipate a delay on our normal dispatch time we will contact you to let you know.

        Occasionally there are delays. We shall not be liable for any direct or indirect losses, costs, damages or expenses incurred by you or any other person for any delays in delivery.

        Missed deliveries where attempted delivery has been made usually result in re-deliveries the following day. The customer is responsible for organising re deliveries by contacting the courier direct

        Parcels/deliveries can only be "left out" if the delivering company allows that option. Parcelforce, for example, do not allow a parcel to be "left out". 

        We are an environment centric business and as such we try to minimise our waste. Our packaging is usually recycled and/or recyclable and we make efficient use of packaging to minimise wastage.

        Covid delivery updates between 12.3.20 and 11.1.21 21 have been archived here.

        Customer Reviews

        Be the first to write a review
        0%
        (0)
        0%
        (0)
        0%
        (0)
        0%
        (0)
        0%
        (0)
        Greenspark Public Impact Profile