{"product_id":"suds-construction-plan","title":"SuDS Construction Phase Plan","description":"\u003cp\u003eA SuDS Construction Phase Plan provides the operational blueprint required by site managers, developers, and Local Authorities to manage surface water and pollution risks safely during construction. \u003c\/p\u003e\n\u003cp\u003eThe Construction Phase plan covers: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSilt \u0026amp; Runoff Mitigation: Prevents sediment-laden water from leaving the site, clogging public sewers, or polluting nearby rivers and streams.\u003c\/li\u003e\n\u003cli\u003eSatisfying Planning Conditions: Fulfills SuDS, Environment Agency (EA), and Local Lead Flood Authority (LLFA) pre-commencement drainage and environmental protection requirements.\u003c\/li\u003e\n\u003cli\u003eAsset Protection: Safeguards sensitive newly built SuDS features (such as rain gardens, bioretention basins, and permeable paving) from being blinded or damaged during active build phases.\u003c\/li\u003e\n\u003cli\u003eRisk Reduction: Reduces the risk of site flooding, environmental enforcement actions, expensive clean-ups, and project delays.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eRequired information: \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFull site address including postcode, site boundary plans, and proximity to watercourses\/public sewers. \u003c\/li\u003e\n\u003cli\u003eProject Scope \u0026amp; Phasing Schedule: Brief outline of proposed groundworks (topsoil stripping, cut-and-fill volumes, deep drainage) and target construction dates.\u003c\/li\u003e\n\u003cli\u003eProposed Drainage \u0026amp; SuDS Layouts: Civil\/drainage drawings showing planned permanent drainage assets (e.g., ACO channels, gullies, permeable paving, rain gardens, attenuation tanks).\u003c\/li\u003e\n\u003cli style=\"color: rgb(5, 5, 5);\"\u003e\u003cspan style=\"color: rgb(5, 5, 5);\"\u003eSite Contacts names and contact details for the appointed Principal Contractor, Site Manager, and Safety\/Environmental Leads (if already appointed).\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cp\u003eIf SuDS design is required, please find our list of \u003ca href=\"https:\/\/loqs4yfye3tx1ji7-8294323.shopifypreview.com\/pages\/suds-calculation-service\"\u003eSuDS drainage design services\u003c\/a\u003e \u003ca href=\"https:\/\/www.freeflush.co.uk\/pages\/suds-calculation-service\"\u003ehere\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003ePlease note:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eAllow 10 working days for the output to be delivered from supply of information requested above. \u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Freeflush","offers":[{"title":"Default Title","offer_id":58601759605120,"sku":"ComparativeSudscalc","price":180.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0829\/4323\/files\/SuDSConstructionPhase_1550e6ea-ba77-4cc2-afca-b0c3598b3d8f.jpg?v=1785504050","url":"https:\/\/www.freeflush.co.uk\/products\/suds-construction-plan","provider":"Freeflush Water Management Ltd. ","version":"1.0","type":"link"}